UVU Pedestrian Bridge over I-15

In the Fall of 2019, UDOT, UTA and UVU broke ground on a pedestrian bridge that will provide access between the Intermodal Center in Orem and the UVU campus. The bridge will span almost 1,000 feet across I-15 and will be 15 feet wide. Elevators on each side of the bridge will accommodate pedestrians, bikes and scooters.  The $30.7 million bridge project will dramatically improve safety for pedestrians and decrease congestion on nearby streets. It will make transit, biking and walking more appealing to University students, staff and visitors while improving the integrated transportation system in central Utah County.

Contact Us

  • 435-200-5360

Contact Us

  • 435-200-5360
  • Construction Update (if needed, will be hidden)

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Close up of UVU Pedestrian Bridge Rendering
UVU Pedestrian Bridge Rendering from the Intermodal Center in Orem
UVU Pedestrian Bridge Rendering from the UVU campus
  • Construction Live Feed
  • Construction Schedule
East Elevator Tower Concrete Work
Late-April
Steel Girders Placement
Late-June
Deck Pours Complete
Late-September
Roof Structure
End of 2020
Lighting, Enclosure and Soffit
Mid-April
Bridge Substructure
Mid-June
West Elevator Tower Concrete Work
Late-August
East Elevator Tower MEP, Elevator and Civil Work
Late-October
West Elevator Tower MEP, Elevator and Civil Work
End of 2020

Scroll to see the construction schedule >>

Agency Partnership

This project is a collaborative effort between UDOT, UVU and UTA to fund and build a multi-modal bridge across I-15 providing a safe, direct route for students and faculty traveling back and forth from housing and the Orem Intermodal Center to campus. The City of Orem and the Mountainland Association of Governments were key partners in the concept, study and design phases of the bridge, and are also important stakeholders in the project moving forward.

Safety in Mind

Security cameras will have full coverage of the bridge, elevators and stairs. They will be monitored by UVU’s public safety department. 

18 security cameraswill be installed 18 security cameraswill be installed UVU PublicSafety Dept

Bridge Facts

  • The bridge will be nearly 1,000 ft long and provides 15 ft of useable walkway width.
  • The bridge deck will be heated, covered and partially enclosed on the sides.
  • High capacity elevators and stairs will be provided on each end of the bridge for ADA and maintenance purposes.
  • The bridge is designed to last over 75 years.